Konakovskaya GRES is a thermal power plant with installed electric capacity of 2,520 MW, heat capacity - 120 Gcal/h.
Sredneuralskaya GRES is a thermal power plant with installed electric capacity of 1,578.5 MW, heat capacity - 1,117 Gcal/h.
Nevinnomysskaya GRES is a thermal power plant with installed electric capacity of 1,551.4 MW, heat capacity - 585 Gcal/h.
The Azov Wind Farm with the installed capacity of 90 MW can generate around 320 GWh per year, avoiding emission of CO2 into the atmosphere.
On May 1, 2021, the Azov Wind Farm was put into commercial operation.
The Kola Wind Farm with the installed capacity of 202 MW can generate around 750 GWh per year, avoiding emission of CO2 into the atmosphere.
On December 1, 2022, the first stage of the Kola wind farm with the capacity of 170 MW was put into commercial operation, the second stage – March 1, 2023.